ROOF REPLACEMENT AT FIRE STATION 36
In general, the Work includes removing the existing built-up roofing system on all low-slope roof areas and installing a complete new Garland SBS modified bitumen roofing system, including all associated membranes, flashings, cover board, tapered transitions, sheet metal components, walk pads, and a new roof access hatch and curb as shown in the approved drawings.
Plans & Specs
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | ||
| BD_BID SET_FS 36 Roof Replacement_For Print_BA | 5.7 MB |

